We always recommend using MOT Sub-bases, but you may decide the base may only need to be compacted soil but local site conditions will dictate the final sub-base build-up.

Use sharp sand to level up the ground. A permeable membrane may be laid under to deter weed growth.

 

Pedestrian and Frequent Vehicle Traffic

Use sharp sand to smooth out undulation over a suitable compacted sub base (MOT Type 1 or similar) at a depth of 10 cm.

For StablePAVE Pro an extra permeable membrane may be laid under to deter weed growth.

 

Heavy Vehicle Traffic

Lay sharp sand to smooth out undulations over a suitable compacted sub base (MOT Type 1 or similar) at a depth of 15 - 20 cm.

For StablePAVE Pro an extra permeable membrane may be laid under to deter weed growth.